Facilities

Proposition S Bond Projects

Holmes Elementary
4902 Mount Ararat Drive, San Diego, CA 92111
Built in 1962
Site Acreage: 9 acres

>>View Holmes Prop S overview

>>District Facilities Assessment

Guiding principles were established by the Board of Education's Ad Hoc Task Force on the Bond to assist in developing educational facilities that:

  • are the heart and soul of the community
  • have parity of the physical facilities and structures
  • improve student learning and achievement
  • improve accountability

Site-Specific Bond Project List

The following needs were identified through a comprehensive planning process, which included input from school site representatives to cluster meetings, district departments and other assessment measures.

The language below will be included in the bond resolution:

Project Improvements to Support Student Learning and Instruction

  • Install a wireless network (WIFI)
  • Provide 21st century technology upgrades, including audiovisual projection capabilities for all students

School Improvements to Support Student Health, Safety and Security

  • Provide campus-wide emergency communications system
  • Install security lighting, as well as increase vandalism and intrusion safeguards, including modifications to fencing
  • Remove or minimize risks of any potentially hazardous material throughout the facility
  • Provide additional parking
  • Improve vehicular and pedestrian circulation Projects to Improve School Accessibility, Code Compliance Upgrades
  • Renovate existing restrooms
  • Improve accessibility to all classrooms, labs, restrooms, and other school facilities to comply with accessibility regulations including ADA Title I & II
  • Install three-compartment sink and hand sink in kitchen
  • Install a grease trap to comply with city regulations in the kitchen
  • Repair/replace/remove old portable classrooms

Major Building Systems Repair/Replacement

  • Repair site sidewalks and hardscape areas
  • Repair/replace heating and ventilation systems as needed
  • Repair and replace gutters, downspouts, catch-basins and underground piping as required to improve drainage and ponding for student safety where needed
  • Replace worn out flooring where needed
  • Repair/replace deteriorating plumbing and sewer systems
  • Replace aging wiring and upgrade electrical systems as needed
  • Repair/restore building interiors, exteriors, finishes and fixtures
  • Repair/replace/upgrade performance spaces/multipurpose rooms

Timeline for Construction Phases

  • Please see this link for updated information on construction development or copy and paste this text in your browser  https://fpcprojects.sandi.net/Pages/Reports.aspx?SchoolName=9147

Details of plan

  • Please see this link for details of the whole site modernization, including a proposed map, or copy and paste this link https://drive.google.com/file/d/1HO2huS6ZelW-65tnsB-fCLpZsbFUvRdG/view?usp=sharing