Proposition S Bond Projects
Holmes Elementary
4902 Mount Ararat Drive, San Diego, CA 92111
Built in 1962
Site Acreage: 9 acres
>>View Holmes Prop S overview
>>District Facilities Assessment
Guiding principles were established by the Board of Education's Ad Hoc Task Force on the Bond to assist in developing educational facilities that:
- are the heart and soul of the community
- have parity of the physical facilities and structures
- improve student learning and achievement
- improve accountability
Site-Specific Bond Project List
The following needs were identified through a comprehensive planning process, which included input from school site representatives to cluster meetings, district departments and other assessment measures.
The language below will be included in the bond resolution:
Project Improvements to Support Student Learning and Instruction
- Install a wireless network (WIFI)
- Provide 21st century technology upgrades, including audiovisual projection capabilities for all students
School Improvements to Support Student Health, Safety and Security
- Provide campus-wide emergency communications system
- Install security lighting, as well as increase vandalism and intrusion safeguards, including modifications to fencing
- Remove or minimize risks of any potentially hazardous material throughout the facility
- Provide additional parking
- Improve vehicular and pedestrian circulation Projects to Improve School Accessibility, Code Compliance Upgrades
- Renovate existing restrooms
- Improve accessibility to all classrooms, labs, restrooms, and other school facilities to comply with accessibility regulations including ADA Title I & II
- Install three-compartment sink and hand sink in kitchen
- Install a grease trap to comply with city regulations in the kitchen
- Repair/replace/remove old portable classrooms
Major Building Systems Repair/Replacement
- Repair site sidewalks and hardscape areas
- Repair/replace heating and ventilation systems as needed
- Repair and replace gutters, downspouts, catch-basins and underground piping as required to improve drainage and ponding for student safety where needed
- Replace worn out flooring where needed
- Repair/replace deteriorating plumbing and sewer systems
- Replace aging wiring and upgrade electrical systems as needed
- Repair/restore building interiors, exteriors, finishes and fixtures
- Repair/replace/upgrade performance spaces/multipurpose rooms
Timeline for Construction Phases
- Please see this link for updated information on construction development or copy and paste this text in your browser https://fpcprojects.sandi.net/Pages/Reports.aspx?SchoolName=9147
Details of plan
- Please see this link for details of the whole site modernization, including a proposed map, or copy and paste this link https://drive.google.com/file/d/1HO2huS6ZelW-65tnsB-fCLpZsbFUvRdG/view?usp=sharing